ABN/NBA - Système Observation Cycle Hydrologique du Bassin du Niger (Niger-HYCOS) - SIH/HIS
Accueil > Nouvelles & Bulletin > Archives > Archives

Archives

Documents archivés (principalement des bulletins hydrologiques).

Articles de cette rubrique


NIGER BASIN AUTHORITY (NBA)

MONTHLY HYDROLOGICAL BULETIN. OCTOBRE 2018 (2018)

NBA/NBO/Hydrological Monitoring
Thursday 29 November 2018 by administrateur, Bachir TANIMOUNE, Didier ZINSOU
The end of October month was characterized by a low flow in the Upper Niger Basin and the Lower Niger River. Meanwhile in the Inner Niger Delta and the Middle Niger the increase in flow continues due to the incoming black flood from upper Niger Basin. The filling up of Selingue dam in Mali and (...)


Niger Basin Autority (NBA)

Monthly hydrological buletin August 2014 (2014)

IWRM2 Projet , NBA Niamey NIGER
1.0 INTRODUCTION The hydrological flow situation in the Niger basin during the month of August was characterized by continued increase of flows in most sub-basins. The flow analysis situation was carried out by dividing the basin into the four sub-catchments also represented with reference (...)


Autorité du Bassin du Niger (ABN)

Bulletin Hydrologique Mensuel Août 2014 (2014)

GIRE2. Unité de Gestion du Projet (UGP)
1.0 INTRODUCTION La situation hydrologique du bassin du Niger au cours du mois d’août a été caractérisée par une poursuite de la montée des écoulements dans la plupart de ses sous bassins. L’analyse des écoulements dans les quatre sous-bassins a été faite à partir des données enregistrées aux stations (...)


Niger Basin Autority (NBA)

Monthly hydrological buletin july 2014 (2014)

IWRM2 Projet , NBA Niamey NIGER
1.0 INTRODUCTION Flow has continued to increase in all part of the Niger Basin as a result of the rainy season. Analysis of the hydrological situation of flows have been sub-divided into 4 watersheds represented by the gauging stations as follows: The Upper Niger in Koulikoro (Mali), The (...)


Autorité du Bassin du Niger (ABN)

Bulletin Hydrologique Mensuel juillet 2014 (2014)

GIRE2. Unité de Gestion du Projet (UGP)
1.0 INTRODUCTION L’écoulement a commencé à augmenter dans le plus part du bassin du Niger en ce mois de juillet 2014 à cause de la saison de pluie. L’analyse de la situation hydrologique des écoulements dans les quatre sous-bassins du fleuve Niger s’appuie sur les données enregistrées au niveau des (...)


Niger Basin Autority (NBA)

Monthly hydrological buletin Jun 2014 (2014)

IWRM2 Projet , NBA Niamey NIGER
INTRODUCTION The Black flood from Guinea has reached its maximum in the Middle Niger in Niamey. It continued with the mean flow in the Inland Delta and the flows tended to the minimum in the Upper and Lower Niger basins. The average monthly flow of 1517 m3/s was recorded in Niamey while 184 (...)


Autorité du Bassin du Niger (ABN)

Bulletin Hydrologique Mensuel Juin 2014 (2014)

GIRE2. Unité de Gestion du Projet (UGP)
INTRODUCTION La crue guinéenne a atteint son maximum dans le Niger Moyen à Niamey. Dans le Delta Intérieur le niveau des écoulements est la baisse alors qu’il tend vers le débit minimum d’étiage dans le Niger Supérieur et Inférieur. Le débit moyen mensuel enregistré à la station de Niamey est de 1517 (...)


Niger Basin Autority (NBA)

Monthly hydrological buletin May 2014 (2014)

IWRM2 Projet , NBA Niamey NIGER
END OF 2013/2014 HYDROLOGICAL YEAR May 2014 marks the end of the hydrological year 2013/2014 in the Niger River Basin. The flows have continued to decline throughout the basin. The monthly average flows recorded at Koulikoro was 187 m3/s, 44m3/s at Dire , was 101 m3/s at Niamey and 3143 m3/s (...)


Autorité du Bassin du Niger (ABN)

Bulletin Hydrologique Mensuel Mai 2014 (2014)

Projet GIRE 2, ABN Niamey NIGER
FIN DE L’ANNÉE HYDROLOGIQUE 2013/2014 Le mois de Mai 2014 marque la fin de l’année hydrologique 2013/2014 sur le fleuve Niger. Les écoulements ont continué à décroitre sur l’ensemble du bassin. Les débits moyens mensuels enregistré étaient de 187 m3/s à Koulikoro, 44 m3/s à Dire ; 101m3/s à Niamey et 3143 (...)


Niger Basin Autority (NBA)

Monthly hydrological buletin April 2014 (2014)

IWRM2 Projet , NBA Niamey NIGER
RIVER NIGER FLOWS SITUATION In April 2014 the flow of the River Niger and its major tributaries have continued to decrease during the month. The analyses of the hydrological situation on the river Niger was carried out using the following stations to represent the Niger basin ; Koulikoro in (...)


Accueil | Contact | Plan du site | | Statistiques du site | Visiteurs : 346876

Suivre la vie du site fr  Suivre la vie du site Nouvelles & Bulletin  Suivre la vie du site Archives   ?

Site réalisé avec SPIP 3.0.20 + AHUNTSIC

Creative Commons License