ABN/NBA - Système Observation Cycle Hydrologique du Bassin du Niger (Niger-HYCOS) - SIH/HIS

ABN/NBA - Système Observation Cycle Hydrologique du Bassin du Niger (Niger-HYCOS) - SIH/HIS

Hydrological Information System (HIS)

Most recent articles


Most recent articles


ABN-GIRE2

Monthly hydrological Buletin September 2013

Unité de Gestion du Projet (UGP)
Tuesday 15 October 2013 by administrateur
1.0 ANALYSES OF RIVER NIGER FLOW SITUATION IN SEPTEMBER September is a period when the rainy season draws to an end in most parts of the Niger Basin. The rainfall during the month complements those of previous months to increase and improve the runoff conditions of river Niger (...)


ABN - GIRE2

Monthly Hydrological Bulletin. August 2013

Unité de Gestion de Projet
Sunday 22 September 2013 by administrateur, Bachir TANIMOUNE
1.0 INTRODUCTION The Niger river since the beginning of the 2nd week of August 2013, recorded an exceptional floods in Upper Niger with most areas affected in Bamako in Mali and also in Middle Niger basin in Niamey (Niger) just as was experienced in 2012. This flood is expected to continue (...)


NBA-IWMR2 / NIGER-HYCOS

June 2013 Monthly Bulletin

Project Management Unit (PMU)
Monday 22 July 2013 by administrateur, Bachir TANIMOUNE
Analyses of the hydrological situation The month of June always marks the beginning of the hydrological year in the Niger basin. Analysis of the hydrological situation have been carried out in the four sub-basin represented by the following areas gauging stations: The Upper Niger in (...)


AUTORITE DU BASSIN DU NIGER/ PROJET GIRE2

Request For Proposals No.001/2013/ABN/DT/GIRE2

N° 001/ABN/DT/GIRE2/2013.
Monday 1 July 2013 by administrateur

construction of the infrastructure described below (2nd class companies at least)

* A secure computer room;
* An average training room that can serve as videoconferencing and meetings;
* Offices experts and IT operations technicians;
* Toilets (Male, Lady).



ABN-GIRE2/NIGER-HYCOS

May 2013 Monthly Bulletin

Project Management Unit (PMU)
Wednesday 26 June 2013 by administrateur, Bachir TANIMOUNE
SUMMARY OF HYDROLOGICAL SITUATION May 2013 marked the end of the 2012/2013 hydrological year which started in June 2012 in the most part of the river Niger basin. The just concluded hydrological year was a period with the highest flood flow ever recorded in Niger basin where many lives (...)


TECHNICAL NOTE

pic of the 2012 Guinea floods at Kandadji

ABN/OBN, ABN/GIRE2
Thursday 22 November 2012 by administrateur
The hydrogramme of the attached figure shows that the pic of the Guinea floods could last in from mid December 2012 to midFebruary 2013 in Kandadji, with a flow rate that could go from 1800 to 2000 m3/s. The water level that corresponds to that flow rate at the Kandadji station would vary (...)


NBA NIGER-HYCOS

RECOMMENDATIONS

2th Regional Steering Committee of GIRE2 project
Friday 14 October 2011 by administrateur
RECOMMENDATIONS Recommendation 1: On the launching of activities of the Phase 2 project Activities of the IWRM Project were launched on 2 December 2010 on the basis of funding obtained from the FDA (€ 3.4 million, financing agreement signed in October 2010), contracts for service agents who (...)


Direct Data access to Hydrological data

Saturday 28 November 2009 by Admin SIH


SIH - Essential documentation for using SPIP

Friday 27 November 2009 by Admin SIH

Essential documents to be able to write an article with SPIP.



Access Data: Station data consultation

Wednesday 18 March 2009 by administrateur

Station list ....... avec des données journalières. Critère de choix 1) type de mesure, 2) groupe, 3) station, 4) mesure, 5) année(s). L’hydrogramme correspondant est alors affiché. On peut alors afficher le tableau de données correspondant, ou sauver les données dans un fichier (CSV).


Home | Contact | Site Map | | Site statistics | Visitors : 385437

Follow site activity en    ?

Site powered by SPIP 3.0.20 + AHUNTSIC

Creative Commons License